1-574 Power Generation from Structures - Stage 2 - Develop (Trial)
What the buyer wrote
Highways England aim to deploy renewable energy source technologies (e.g. wind, solar) on structures across the SRN to power the technology with no or reduced reliance on Distribution Network Operator (DNO) supplies. The overall task is broken down into five stages, as outlined below. This task takes the outcome of the Options Report in Stage 1 and implements the procurement strategy and trial design developed in Stage 2 Phase 1: Stage 1. Discover - understand the technology solutions available and relevant to the needs of Highways England. Produce an Options Report. Stage 2. Develop - develop a modular solutions model for the various structures deployed on the network or test site for pr…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- 1-574 Power Generation from Structures - Stage 2 - Develop (Trial)
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- services
- Work starts
- 21 Aug 2019
- Work ends
- 30 Sep 2020
Who the buyer named
The buyer published a contact address on this notice.
