1-723 Technical Consultancy for M48 Severn Bridge Main Cable Assessment
Highways Englandservices
What the buyer wrote
The objectives are to review the traffic loading (WIM) data, Acoustic Monitoring and Dehumidification data for each three monthly period and produce quarterly reports. Carry out a yearly review of all the data and produce a report for that period. When required on a call off basis carry out a BSALL assessment due to unforeseen events i.e. excessive wire breaks (outside criteria laid down in the Monitoring Specification), abnormal traffic loadings, caused by queuing on the structure etc. Review all the documentation and produce an Assessment Certificate.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- 1-723 Technical Consultancy for M48 Severn Bridge Main Cable Assessment
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- services
- Work starts
- 5 Feb 2019
- Work ends
- 28 Feb 2021
Who the buyer named
The buyer published a contact address on this notice.
