Skip to the main content
The Crier

1-723 Technical Consultancy for M48 Severn Bridge Main Cable Assessment

Your saved contracts

What the buyer wrote

The objectives are to review the traffic loading (WIM) data, Acoustic Monitoring and Dehumidification data for each three monthly period and produce quarterly reports. Carry out a yearly review of all the data and produce a report for that period. When required on a call off basis carry out a BSALL assessment due to unforeseen events i.e. excessive wire breaks (outside criteria laid down in the Monitoring Specification), abnormal traffic loadings, caused by queuing on the structure etc. Review all the documentation and produce an Assessment Certificate.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Atkins£84.8kends (28 Feb 2021)

Details

What the buyer calls it
1-723 Technical Consultancy for M48 Severn Bridge Main Cable Assessment
How they are buying
Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
Type
services
Work starts
5 Feb 2019
Work ends
28 Feb 2021

Who the buyer named

The buyer published a contact address on this notice.

Dafydd.Church@highwaysengland.co.uk