Skip to the main content
The Crier

1214 - Outhouse for Storage and Fork Lift Truck

Your saved contracts

What the buyer wrote

CPI have a requirement for the supply and installation of a sectional building, which is to be located to the rear of The Coxon Building, NETPark, Sedgefield, TS21 3FE. The supplier is required to design, supply and install a prefabricated sectional building, including all materials and services detailed in this tender unless otherwise stated as supplied / free issued by CPI or others.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Lytestream Electrical Engineers & Contractors Limited£72.6kends (4 Sep 2023)

Details

What the buyer calls it
1214 - Outhouse for Storage and Fork Lift Truck
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
15 Aug 2019
Work ends
4 Sep 2023

Who the buyer named

David Cooper was the named contact on this notice.

e-tendering@uk-cpi.com