Skip to the main content
The Crier

14 095 Contract for the Design and Construction of A536 Congleton Link Road

Your saved contracts

What the buyer wrote

The proposed A536 Congleton Link Road is a 5.7km long, 9.3m wide single carriageway road running to the north of Congleton between the A534 Sandbach Road in the west and the A536 Macclesfield Road in the northeast. The mainline has five 50m and one 60m diameter radii roundabouts including junctions with the A54 and A34. The link road passes beneath Chelford Road in an area subject to a high water table. The road will be cut approximately 8m deep into mudstone in a 25m high escarpment before crossing the River Dane on an 85m long bridge and landing on a 12m high embankment founded on piled alluvium. There are two other road bridge crossings and two underpasses. The scheme also has approximate…

Read all of it on Contracts Finder →

Details

What the buyer calls it
14 095 Contract for the Design and Construction of A536 Congleton Link Road
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Jul 2018
Work ends
12 Jun 2025

Who the buyer named

Steve Mellor was the named contact on this notice.

steve.mellor@cheshireeast.gov.uk