Skip to the main content
The Crier

1720 - M5 J20-19 Wynhol Viaduct Upper MP151.30A Concrete Testing and Stud Testing SW

Your saved contracts

What the buyer wrote

Wynhol Viaduct carries the M5 motorway along the side of the Gordano Valley between Junctions 19 and 20. There are two separate viaduct structures, one carrying the Northbound carriageway (Lower Viaduct) and a second carrying the Southbound carriageway (Upper Viaduct). Parapet protection and repair works are required along the Lane 3 off-side (central reserve) parapet which not only covers the Upper viaduct structure, but also adjacent Median Retaining Walls 1 and 2. Wynhol Viaduct Lower & Upper require concrete testing grids to the traffic facing up stands and top faces at multiple locations along the southbound hard shoulder only, and at two locations on the northbound hard shoulder an…

Read all of it on Contracts Finder →

Details

What the buyer calls it
1720 - M5 J20-19 Wynhol Viaduct Upper MP151.30A Concrete Testing and Stud Testing SW
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
5 Feb 2018
Work ends
9 Feb 2018
Kind of work
Construction

Who the buyer named

The buyer published a contact address on this notice.

Rebecca.Jones2@highwaysengland.co.uk