1720 - M5 J20-19 Wynhol Viaduct Upper MP151.30A Concrete Testing and Stud Testing SW
What the buyer wrote
Wynhol Viaduct carries the M5 motorway along the side of the Gordano Valley between Junctions 19 and 20. There are two separate viaduct structures, one carrying the Northbound carriageway (Lower Viaduct) and a second carrying the Southbound carriageway (Upper Viaduct). Parapet protection and repair works are required along the Lane 3 off-side (central reserve) parapet which not only covers the Upper viaduct structure, but also adjacent Median Retaining Walls 1 and 2. Wynhol Viaduct Lower & Upper require concrete testing grids to the traffic facing up stands and top faces at multiple locations along the southbound hard shoulder only, and at two locations on the northbound hard shoulder an…
Details
- What the buyer calls it
- 1720 - M5 J20-19 Wynhol Viaduct Upper MP151.30A Concrete Testing and Stud Testing SW
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 5 Feb 2018
- Work ends
- 9 Feb 2018
- Kind of work
- Construction
Who the buyer named
The buyer published a contact address on this notice.
