1NextGen Electrolysis - Blending Equipment
What the buyer wrote
WWU require a supplier to design and install a hydrogen blending unit and associated equipment to blend up to a maximum of 20% hydrogen by volume into the customers' existing natural gas supply. The injection will take place downstream of the meter where the end use is combustion to provide heat to the customers existing process. The customer process in non-interruptible and should the blend ratio go above the maximum allowable or if there is any failure of the hydrogen supply the blending infrastructure must be able to revert to 100% natural gas in order to maintain supply to the customer. The blending infrastructure will need to be able to meet the requirements set out in the scope. These …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- 1NextGen Electrolysis - Blending Equipment
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- goods
- Lots
- 2
- Where
- in the North East, in the North West, in Yorkshire and The Humber, in the East Midlands, in the West Midlands, in the East of England, in London, in the South East, in the South West, in Wales
Who the buyer named
Gemma Deverill was the named contact on this notice.
