What the buyer wrote
There is a requirement at the University of Nottingham (UON) within the Gas Turbine & Transmissions Research Centre (GTTRC) for a test facility with two independent drive shafts to test a variety of aero engine and advanced power transmissions based unit under test (UUT). The facility design shall be of a modular nature to provide for the maximum flexibility in accommodating current and future test requirements. The facility design should include the flexibility to allow future upgrading with minimum cost and effort. The future upgrades are likely to include an increase in speed for drive Module D2 (see Requirement TR00107-MD-02) and to accommodate different drive layout configurations…
Details
- What the buyer calls it
- 2 Shaft Test FACILITY_TR00107 Issue4
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Work starts
- 6 Apr 2016
- Work ends
- 18 Oct 2017
Who the buyer named
Helen Forsythe was the named contact on this notice.
