2218 Digby Surface Water Flood Alleviation Scheme
What the buyer wrote
Construction of a surface water flood alleviation channel around the eastern side of the village of Digby. Works entail cutting new and modifying existing channels, 4 no. box culvert crossings, RC flood wall, alteration of existing highways and accommodation works to private properties.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- 2218 Digby Surface Water Flood Alleviation Scheme
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Mar 2020
- Work ends
- 1 Sep 2020
Who the buyer named
Ms Sheralee Lunn was the named contact on this notice.
