What the buyer wrote
Three Temporary Working Environments (TWE) to be sited at RAF Waddington. Each TWE to comply with the following requirements: Steel Framework with the steel complying to BS EN ISO 1461:2009 regulations and with a 25 year anti corrosion guarantee Fabric membrane to comply with BS 3424. Fabric to be flame retardant and self extinguishing and compliant with BS 5438 25m span x 40m long x 5.5m leg eaves height 1 Vertical lifting Heli-door with a clear opening of 21m x 7m powered by a generator to be supplied as part of construction 4 Porch Fire/access doors Insulated cladding. To be 150mm deep, fire resistant and with a self cleaning inner Mains distribution panel 500 Lux Lighting Emergency Li…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- 2500000
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Type
- goods
Who the buyer named
The buyer published a contact address on this notice.
