The scope of demolition and removal works includes all high-level ductwork connections to main building, foundations / plinths, all MEP Plant, autoclave plinth walls, all below ground drainage pipework etc. Removal of oversite concrete, above ground drainage pipework, access staircases, pathways, fences, posts, gates and bases. Isolation and disconnection, removal and backfilling of all below ground drainage services to B139 all as detailed on the tender drawings included with the tender pack.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

GM Builders UK Ltd£84.5kends (3 Apr 2020)

Details

What the buyer calls it
27396 - B139 Demolition
How they are buying
Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
17 Feb 2020
Work ends
3 Apr 2020