The drainage asset survey consists of inspections at six locations. The cross carriageway culverts are typically 15-30m in length for single and dual carriageway sections respectively. Traffic management, where required, shall be provided by the M&R Contractor, CHC. The recommended TM layout or suitable alternative is detailed below for each location. Environmental RAG / location plans are provided by the Client which the Contractor shall review and action where required to determine safe system of working prior to commencement on site.
Details
- What the buyer calls it
- 562589 - Area 14 Structures CCTV Investigation
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 13 Nov 2017
- Work ends
- 20 Nov 2017