What the buyer wrote
The drainage asset survey consists of inspections at six locations. The cross carriageway culverts are typically 15-30m in length for single and dual carriageway sections respectively. Traffic management, where required, shall be provided by the M&R Contractor, CHC. The recommended TM layout or suitable alternative is detailed below for each location. Environmental RAG / location plans are provided by the Client which the Contractor shall review and action where required to determine safe system of working prior to commencement on site.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- 562589 - Area 14 Structures CCTV Investigation
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 13 Nov 2017
- Work ends
- 20 Nov 2017
Who the buyer named
The buyer published a contact address on this notice.
