Skip to the main content
The Crier

9407 - Structural Repairs to External Stairs and Landings at:Orchard Street, West Pottergate & Paragon Place - Stairs Phase 4

Your saved contracts

What the buyer wrote

Maintenance and repair works are required to a range of structural defects which relate to (but may not be limited to):- Works comprises of 5 blocks of flats within similar low rise residential estates. The works involve: Repairs to external reinforced concrete access decks/landings and staircases including surface preparation, survey, break out, repair, selective use of corrosion inhibitors, surface treatment and protective coatings. In addition works include preparation, repair and over coating access deck/landings membranes and concrete staircases, renewing any movement joints in decks, removing existing painted galvanised metal railings to access decks/landings and stair…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

JB Specialist Refurbishments Ltd£181kends (30 Nov 2017)

Details

What the buyer calls it
9407 - Structural Repairs to External Stairs and Landings at:Orchard Street, West Pottergate & Paragon Place - Stairs Phase 4
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
21 Oct 2016
Work ends
30 Nov 2017

Who the buyer named

Richard Buckenham was the named contact on this notice.

richardbuckenham@norwich.gov.uk