What the buyer wrote
Install 1800mm soakaway rings to a depth of 2.2m in carriageway (on concrete foundation), rings to be filled with shingle and 2No. existing gullies connected into soakaway. Install 1No. gully pot and frame and connect into soakaway. Surfacing to re-profile heading allowing water to fall into gullies.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- A1010 South Section 1 Soakaway
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 9 Apr 2019
- Work ends
- 31 May 2019
Who the buyer named
Mr Aaron John was the named contact on this notice.