A1058 Coast Road LEP Phase 3 - Norham Road Bridge Works
What the buyer wrote
Phase 3 of this project improvements briefly comprise the following: - • The redesign of Coast Road’s junctions with Norham Road. The replacement of the existing Norham Road bridge with a newer, wider structure; • Signing amendments including direction signs and speed limit signs; • Road marking amendments; • New and improved pedestrian / toucan crossing points including signal control, dropped kerbs and tactile paving. This contract includes the replacement of the existing Norham Road bridge with a newer, wider structure and the widening of the existing road and pavements. A1058 Coast Road LEP Phase 3 – Norham Road The Authority is seeking applications from suitable or…
Details
- What the buyer calls it
- A1058 Coast Road LEP Phase 3 - Norham Road Bridge Works
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 3 Jan 2017
- Work ends
- 2 Jan 2018
- Kind of work
- Civil engineering and groundworks
Who the buyer named
Mark Perry was the named contact on this notice.
