Skip to the main content
The Crier

A4119 Coed-ely Dualling

Your saved contracts

What the buyer wrote

The proposed scheme will dual the existing section of the A4119 from the South Wales Fire and Rescue Service Headquarters Roundabout to the Coed-ely Roundabout. The scheme is 1.3km in length and will create two 3.65m lanes in both directions with a central reserve. The project will include improvements to Active Travel provision through the addition of a 3-metre wide Active Travel route alongside the proposed dualling scheme and an Active Travel bridge at the Coed-ely roundabout, linking into the local network.

Bid for this and lost? There is a short window in which the decision can be questioned.

Details

What the buyer calls it
A4119 Coed-ely Dualling
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Where
in Wales

Who the buyer named

The buyer published a contact address on this notice.

energy@rctcbc.gov.uk