What the buyer wrote
The project site consists of three separate locations situated near Selby, namely, Location 1: on A63 Selby Bypass, Location 2: On East Common Lane and Location 3: on A19. Location 1 and 3 includes plane and inlay work on circulatory carriagway on two roundabouts. The type of work in general, comprises plane off existing carriageway and Inlay with new asphalt materials. Carriageway treatment width is between white line to white line. Hard Strip on both sides of the carriageway will be planned and resurfaced with 50mm HRA. The treatment on A63 Selby Bypass includes Stress Absorbing Membrane Interlayer (SAMI) to be placed on top of the Base Layer before laying the new asphalt layers on …
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- A63 Selby Bypass Reconstruction Phase 3
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- services
- Work starts
- 28 Aug 2017
- Work ends
- 13 Oct 2017
- Kind of work
- Construction
Who the buyer named
Mrs Laura Baxter was the named contact on this notice.
