Skip to the main content
The Crier

Adaptor Plate for 15MW Forced Application System

Your saved contracts

What the buyer wrote

ORE Catapult own and operate a 15MW Drive Train Test Facility, designed for testing the drive trains and individual components of offshore wind turbines. To improve the ability of the test rig to interface with customers' test pieces, ORE Catapult is looking to appoint a single Contractor to manufacture and supply one (1) multi-functional adaptor plate. The adaptor plate has been designed by the ORE Catapult mechanical design team to withstand the static and fatigue loads that may be foreseeably applied to it. OJEU Ref : 2019/S 028-061816

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

TSP Engineering Ltd£347.9kends (30 Sep 2020)

Details

What the buyer calls it
Adaptor Plate for 15MW Forced Application System
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
24 Apr 2019
Work ends
30 Sep 2020
Kind of work
Construction

Who the buyer named

Sheena Thomson was the named contact on this notice.

procurement@ore.catapult.org.uk