Air Start Replacement Project (ASRP)
What the buyer wrote
The User requires a turbine-driven air start capability, to support the operation and maintenance of designated aircraft types. The capability will be required to support the enabling of the Strategic Base; fulfil standing commitments; development and maintenance of a contingent capability; and contingent operations commensurate with the direction provided in Defence Strategic Direction 2016, the RAF Command Plan and the requirements of Joint Force 2025. The DPQQ can be accessed via Defence Contracts Online (contracts.mod.uk) and the Access Code is 9HWV5JS889
Details
- What the buyer calls it
- Air Start Replacement Project (ASRP)
- How they are buying
- Advertised, then negotiatedThe buyer talked terms with bidders rather than taking fixed offers.
- Type
- goods
- Where
- in the South West
- Kind of work
- Transport and fleet
Who the buyer named
Christopher Simmons was the named contact on this notice.
