Alterations in Connection with Scarborough
What the buyer wrote
The project comprises internal alterations and refurbishment to provide new and upgraded teaching and learning accommodation, including a Student Entrance Lobby Extension The project also includes for the removal of existing fixtures and fittings from other College accommodation within Scarborough and transporting the items to Scarborough TEC and positioning / fixing the items within the newly created spaces, including associated works All elements of this project will require full liaison and co-operation with Principal Designer in the development of Health and Safety Files and as fitted drawings. The group has named a number or products on the drawings/specifications based upon a…
Details
- What the buyer calls it
- Alterations in Connection with Scarborough
- How they are buying
- The buyer did not say
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Jul 2017
- Work ends
- 3 Jul 2018
Who the buyer named
Mel Day was the named contact on this notice.
