Skip to the main content
The Crier

Annealing Furnace

Your saved contracts

What the buyer wrote

What is included The contractor shall design, supply all materials and components, assemble, inspect, test, package and deliver the equipment and supporting documentation as specified in this document. Specifically, the contractor shall supply; • 2 remotely operated in-cave Annealing Furnaces. • 2 out of cave control systems. • 2 sets of umbilical cables to connect the in-cave rigs to the out of cave control systems. • 2 sets of gas bottles and manifolds for inert gas. • Design documentation for the Annealing Furnaces in accordance with the contractor’s own quality management system procedures. For example, drawings, calculations, design risk assessments, basis of design etc. • Quality plan.…

Read all of it on Find a Tender →

Details

What the buyer calls it
Annealing Furnace
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
goods

Who the buyer named

Michael Jones was the named contact on this notice.

michael.jones@nnl.co.uk