Skip to the main content
The Crier

Appliance Bay Floor Renewals - Various Sites

Your saved contracts

What the buyer wrote

The Authority has a requirement to renew Appliance Bay Floor coverings with a new anti-slip flooring system at five fire stations. The works will include but not be limited to: 1) Remove and dispose of existing floor finishes 2) Make good disturbance to building fabric to a good standard 3) Make good to floor levels 4) Introduce appliance bay drainage where directed 5) Install a new anti-slip coating to appliance bay floor as specified. Bidders should review the tender documents available through the tendering portal (link included in this notice) to determine their capability to implement the proposed flooring system.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Maker Coating Systems Limited£39.7kends (30 Nov 2018)

Details

What the buyer calls it
Appliance Bay Floor Renewals - Various Sites
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
19 Sep 2018
Work ends
30 Nov 2018

Who the buyer named

The buyer published a contact address on this notice.

procurement@dsfire.gov.uk