Skip to the main content
The Crier

Appliance Bay Floor Renewals (various sites)

Your saved contracts

What the buyer wrote

The project consists of the renewal of Appliance Bay floor coverings with a new anti-slip flooring system at five sites. The proposed works include but are not limited to the following items of work:- 1. Remove and dispose of existing floor finishes 2. Remove and dispose of existing upstands or heater plinths 3. Make good disturbance to building fabric to a good standard 4. Make good to floor levels, including any levelling required 5. Install a new anti-slip coating to appliance bay floor as specified. 6. Where identified install drainage The works are internal and located on the ground floors, in the appliance bays.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Surface Systems£55.3kends (29 Mar 2019)

Details

What the buyer calls it
Appliance Bay Floor Renewals (various sites)
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Work starts
22 Feb 2019
Work ends
29 Mar 2019

Who the buyer named

Aimee Lee was the named contact on this notice.

pme@dsfire.gov.uk