Appointment of a Project Manager led ICT for BRCD - the Gobbins Phase 2
What the buyer wrote
Mid and East Antrim Council wish to appoint an Economic Operator to provide a Project Manager led Integrated Team (ICT) for the design and delivery of "The Gobbins Phase 2" The Gobbins Phase 2 project aims to address capacity issues, principally by introducing a looped walk that connects the coastal path to the cliff top path, meaning that visitors do not have to return along the same path. The development will unlock the potential of The Gobbins, significantly increasing. The proposal for the project will include the following key elements; • Element 1 - Ingress Structure • Element 2 - Welcome Hub • Element 3 - Virtual Reality Digital Enhancement at the existing Visitor Centre • Elemen…
Details
- What the buyer calls it
- Appointment of a Project Manager led ICT for BRCD - the Gobbins Phase 2
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- services
- Where
- in Northern Ireland
Who the buyer named
Procurement Team MEA was the named contact on this notice.
