Skip to the main content
The Crier

Area 4 Buttercrambe, Stamford & Helperthorpe R&R Package

Your saved contracts

What the buyer wrote

Buttercrambe: Works under 8-hour daytime road closure. Single track lane with limited passing places or turning areas. Isolated lengths of kerbing/channelling to delineate and provide support to edge of carriageway. Provision of concrete lined drainage grips. Some carriageway reconstruction/widening works with excavation up to 350mm deep. Mainly overlay of existing carriageway with depths varying 60mm, 100mm to 160mm. Stamford: Works under 8-hour daytime road closure but would prefer 3-way traffic signals if geometry allows. 50m length of kerbing/channelling with 50m x 1m x 40mm deep patch reinstatement to front to arrest overrun damage. Working time restriction 0930 to 1630 to avoid peak tr…

Read all of it on Contracts Finder →

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Hanson Quarry Products Europe Ltd T/A Hanson Contracting£296.8kends (23 Oct 2020)

Details

What the buyer calls it
Area 4 Buttercrambe, Stamford & Helperthorpe R&R Package
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
6 Sep 2020
Work ends
23 Oct 2020

Who the buyer named

Alison Dickinson was the named contact on this notice.

alison.dickinson@northyorks.gov.uk