What the buyer wrote
Marishes Lane - Carriageway overlay 100mm thk (60mm AC20 HDM Binder & 40mm AC10 CGM Surface Course) and 50mm thk (50mm AC10 CGM Surface Course) refer to G.A drawings 01 to 06 for exact locations and chainage lengths. Additonal works consist of 60/40 patching and small lenghts of Half Battered Kerbing to bends. Small amount of drainage works installing new gully and permenant grips to shed standing water from exisiting road surface. Iron work to adjust were required, making up of verges with Type 1 road stone and top soil.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Area 4 - C68 Marishes Lane, Low Marishes
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 5 Mar 2018
- Work ends
- 29 Mar 2018
- Kind of work
- Construction, Water, drainage and flood management
Who the buyer named
Alison Dickinson was the named contact on this notice.
