Skip to the main content
The Crier

Area 6 A61 Ripon Road R&R

Your saved contracts

What the buyer wrote

Carriageway patching, reconstruction and resurfacing along the A61 between South Stainley and Quarry Moor Roundabout, Ripon. Carriageway re-construction and resurfacing at various locations along the length at 50mm, 110mm and 210mm depths. Associated works include resetting/replacement of ironworks and reinstatement of road markings and road studs.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Tarmac Trading Ltd£523.9kends (25 Apr 2019)

Details

What the buyer calls it
Area 6 A61 Ripon Road R&R
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Work starts
31 Mar 2019
Work ends
25 Apr 2019

Who the buyer named

Alison Dickinson was the named contact on this notice.

alison.dickinson@northyorks.gov.uk