Skip to the main content
The Crier

Area 7 Construction Works Framework Lot 2: Corrosion Protection

Your saved contracts

What the buyer wrote

Supply of materials, plant and labour for the application of painting systems including specialist corrosion protection systems and for the design, certification, installation, maintenance and removal of any temporary works required to ensure a safe method of working.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

Taziker Industrial Ltdends (31 May 2020)

Details

What the buyer calls it
Area 7 Construction Works Framework Lot 2: Corrosion Protection
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
17 May 2016
Work ends
31 May 2020

Who the buyer named

The buyer published a contact address on this notice.

TransparencySGRM@highwaysengland.co.uk