What the buyer wrote
2.1.1 The principal aim of this study is to investigate the water quality of three highway drainage outfall points on the A14 between Junction 19 (M1 / Swinford) and Junction 13 (A45 and A605 / Thrapston), and their impact on the quality of receiving watercourses. 2.1.2 To achieve the aim, the Contractor will undertake and complete the following study-specific objectives: • To undertake targeted sampling surveys; (1) Water sampling at the point of outlet to determine quality of highways runoff; (2) Sediment sampling within concrete-lined ditches between outlet and outfall, where requested; (3) Upstream and downstream water and sediment sampling within receiving watercourses. • To exa…
Details
- What the buyer calls it
- Area 7 - EDF A14 & A43 Sampling TST - LHJ
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 27 Nov 2017
- Work ends
- 20 Dec 2017
- Kind of work
- Water, drainage and flood management
Who the buyer named
The buyer published a contact address on this notice.
