What the buyer wrote
Fish passage improvements to a vertical faced weir: The construction of a notched pre-barrage downstream and perpendicular to the existing weir, the formation of a formal fish passage notch within the existing low-flow notch and local raising of the existing weir crest. The construction of a proprietary eel pass and the protection of adjoining riverbed and banks with stone pitching and rip-rap is also required. Full details are provided in the appended documents. Additional information: We anticipate delivery of the project by 25 September 2020 but please note that the delivery of the project is totally dependent on attaining all required statutory consents.
Details
- What the buyer calls it
- Ashford Weir Fish Passage Improvements
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 29 Jul 2020
- Work ends
- 25 Sep 2020
Who the buyer named
David Chapman was the named contact on this notice.