Assess the impact of recently-built flood protection schemes in managing long-term flood risk in England
What the buyer wrote
The objective of this project is to better understand to what extent recently delivered flood alleviation schemes in England have been designed to support the long-term reduction in residual flood risk. The specific aims of this project are to review a sample of the major schemes contributing towards the delivery of better flood protection to 180,000 households over the 2010/11 to 2014/15 period and understand: 1. The impact of the flood alleviation schemes in managing long-term flood risks, by assessing the current and future standard of protection achieved by the scheme in comparison to what was in place previously. This would include considering how climate change has been factored…
Details
- What the buyer calls it
- Assess the impact of recently-built flood protection schemes in managing long-term flood risk in England
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 12 Dec 2016
- Work ends
- 31 Mar 2017
Who the buyer named
Aaron Goater was the named contact on this notice.
