Skip to the main content
The Crier

Automation consultancy service

Your saved contracts

What the buyer wrote

At the EBRI plant, a fluidised bed gasifier (1 MW) is connected to a combined heat and power generator. The capacity of the engine is not enough as to take all the gas from the gasifier, so part of the gas has to be flared. The engine is a MAN marine diesel engine modified to work in dual mode (liquid and gaseous biofuels). The engine starts in liquid fuel mode and if required the load matching control system opens an isolation valve to start fuelling the engine with gas from the gasifier. A flowmeter measures the gas flowrate being burned in the engine. Apart from this isolation valve, also a fast acting valve is being installed, to regulate the delivery of fuel gas to the engine, t…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Automation consultancy service
How they are buying
The buyer did not say
Type
services
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Jun 2015
Work ends
2 Jul 2015

Who the buyer named

Jason Goodwin was the named contact on this notice.

j.goodwin@aston.ac.uk