AWARDED via LCP Framework: Electronic Engineering Science Building - Main Contractor
What the buyer wrote
The appointment of a main contractor for the Construction of a new 3 storey Electronic Engineering Science Building with integrated lecture theatre and small roof top teaching space. Located on the South Campus of the College's Main site in Egham, Surrey (TW20 0EX), the site is adjacent to student accommodation and teaching and blocks. Let via further competition under Lot 3 of the LCP W1 MW14 Framework Agreement
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- AWARDED via LCP Framework: Electronic Engineering Science Building - Main Contractor
- How they are buying
- The buyer did not say
- Type
- works
- Work starts
- 9 Jan 2017
- Work ends
- 4 Apr 2018
- Kind of work
- New build construction