Skip to the main content
The Crier

Axmouth Harbour Concrete Loading Area

Your saved contracts

What the buyer wrote

The works consist of construction of a concrete loading area, including: excavation of existing stone road; infill of adjacent potholes with excavated material; installation of tanalised timber edging; laying of ducting and pipes for extension of services, including draw pit installation; installation of reinforcement mesh; pouring of concrete to tie in with existing levels; transport of excess excavated material to Seaton Wetlands.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

C Sansom Ltd£16.3kends (1 Jan 2018)

Details

What the buyer calls it
Axmouth Harbour Concrete Loading Area
How they are buying
Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
20 Nov 2017
Work ends
1 Jan 2018

Who the buyer named

Miss Olivia Stevens was the named contact on this notice.

olivia.s.stevens@devon.gov.uk