Skip to the main content
The Crier

B Row Replacement Polytunnels

Your saved contracts

What the buyer wrote

Supply only of 4 off twin-span clear plastic Polytunnels to be erected over pre-existing ponds at Calverton Fish Farm near Nottingham. Tunnels are used to heat the water in the fish rearing ponds using Solar energy and the new units will replace existing structures that are beyong economical repair. Erection of structures to be carried out by Contractors. Additional information: Specification and sizes of the Polytunnels is attached along with images showing detail of existing structures.

Details

What the buyer calls it
B Row Replacement Polytunnels
How they are buying
Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
Type
goods
Suitable for small firms
The buyer says yes. What that is worth
Work starts
22 Dec 2020
Work ends
5 Feb 2021

Who the buyer named

Emma Roberts was the named contact on this notice.

emisk@cefas.co.uk