Supply only of 4 off twin-span clear plastic Polytunnels to be erected over pre-existing ponds at Calverton Fish Farm near Nottingham. Tunnels are used to heat the water in the fish rearing ponds using Solar energy and the new units will replace existing structures that are beyong economical repair. Erection of structures to be carried out by Contractors. Additional information: Specification and sizes of the Polytunnels is attached along with images showing detail of existing structures.
Details
- What the buyer calls it
- B Row Replacement Polytunnels
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Type
- goods
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 22 Dec 2020
- Work ends
- 5 Feb 2021
- Kind of work
- New build construction