Skip to the main content
The Crier

B176 VRV System Replacement

Your saved contracts

What the buyer wrote

Building 176 has two separate 3 pipe VRV systems (VRV 1 & 2) that serve four hub rooms within the building. The original installation incorporated "Hydroboxes" linked to the buildings hot water system to recover waste heat to assist with the generation of hot water.

Bid for this and lost? There is a short window in which the decision can be questioned.

Awarded to

J&E Hall International£22.7kends (31 May 2020)

Details

What the buyer calls it
B176 VRV System Replacement
How they are buying
Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
1 Mar 2020
Work ends
31 May 2020

Who the buyer named

Inez Scudder was the named contact on this notice.

is3@soton.ac.uk