What the buyer wrote
Building 176 has two separate 3 pipe VRV systems (VRV 1 & 2) that serve four hub rooms within the building. The original installation incorporated "Hydroboxes" linked to the buildings hot water system to recover waste heat to assist with the generation of hot water.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- B176 VRV System Replacement
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 1 Mar 2020
- Work ends
- 31 May 2020
Who the buyer named
Inez Scudder was the named contact on this notice.
