B3181 Baulk Bridge Replacement
What the buyer wrote
This contract requires a replacement bridge to replace the existing one on the B3181. The existing bridge is in poor condition and previous investigations have determined it is not economical to repair and therefore a new replacement bridge is required, with a 120-year design life. The replacement will be located on a new alignment to allow for the existing road to remain open for a significant time during construction, without the need to severely interrupt traffic flows or to provide a temporary bridge. The requirement for a replacement bridge provides an opportunity to improve the highway alignment by locating the bridge downstream of the existing bridge, via 320m of realigned carriageway…
Bid for this and lost? There is a short window in which the decision can be questioned.
Details
- What the buyer calls it
- B3181 Baulk Bridge Replacement
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Where
- in the South West
Who the buyer named
Abigail Muzvimwe was the named contact on this notice. Questions closed on 24 Nov 2025, 12:00 GMT.
