What the buyer wrote
Mirion to attend site on an annual basis to carry out annual maintenance to the B80 & B33 CID System following the requirements in the Annual Maintenance Test Document as follows: • Section 1.9 Visual Inspection. • Section 2 Input Testing • Section 3 Output Testing • Section 4 Diagnostics, 4.1, 4.2, 4.3, 4.4 (full subset) • Section 5 CEU Equipment Field Connection Listings. • Section 6 Signal Flow Test • Section 7 System Operating Parameters, 7.1, 7.2, 7.3, 7.4 Additional the following tests/maintenance to be included to ensure compliance with ES-1-2501-1 • Cleaning of all heat sinks, filters and vents in the CID panel. Documentation to be provided by the contractor to include as a minimum d…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- B80 & B33 CID system maintenance
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Work starts
- 7 May 2025
- Work ends
- 31 Mar 2026
- Where
- in the North West
- Kind of work
- Clinical and healthcare services
Who the buyer named
Becky Hughes was the named contact on this notice.
