B990 Fordingbridge Bypass Half-Joint Investigation
What the buyer wrote
B990 Fordingbridge Bypass carries the A338 single carriageway over River Avon. The bridge is a single span portal, comprising reinforced concrete cantilevers with a suspended composite deck central span supported in form of half-joints. Previous inspections have shown defects across the edges of both (north & south) half-joints due to degraded sealant over the expansion joints and ingress of water. These defects, however, have not been fully examined closely due to access constraints. This contract therefore is to undertake detailed half-joint investigation and concrete testing. The results will form a key design input into a maintenance scheme being developed to ensure increased du…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- B990 Fordingbridge Bypass Half-Joint Investigation
- How they are buying
- Quotes from a few suppliersThe buyer approached a small number directly rather than advertising it.
- Type
- services
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 2 Aug 2018
- Work ends
- 16 Nov 2018
Who the buyer named
Lesley Tollefsen was the named contact on this notice.