What the buyer wrote
The existing retaining wall on the lower section of Beach Road is slipping down the coastal slope, which in turn is causing the carriageway to fail. There is currently a 3T weight limit on the road as a result. Therefore a new retaining structure is required to stop the road collapsing. The works comprise of piling into the existing carriageway behind the existing wall, and installing ground anchors to tie the piles back to stable ground. A new parapet wall is to be constructed along the top of the piled wall. A new kerb line is to be laid behind the new wall and the carriageway resurfaced. Additional information: This procurement process was a Further Competition from Torbay Coun…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Babbacombe Beach Road Stabilisation Scheme
- How they are buying
- The buyer did not say
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 30 Nov 2020
- Work ends
- 26 Feb 2021
- Kind of work
- Civil engineering and groundworks