Skip to the main content
The Crier

Baldwins Pond Dam Safety Improvements

Your saved contracts

What the buyer wrote

The project comprises the design and construction of improvements to Baldwins Pond, potentially including for (but not necessarily limited to):- a) Measures to permanently stem leakage through the dam, potentially by the formation of vertical "cut off" layer along the critical length of the dam, toed into natural sub-strata; b) Measures to provide a new impermeable lining to the remaining section of culvert/fill left after the fire damage to the previous 900mm diameter corrugated GRP pipe; c) Measures to provide an auxiliary emergency spillway to the dam, to convey flood flows that are beyond the capacity of the current arrangements, as appropriate to the catchment area and risk ca…

Read all of it on Contracts Finder →

Details

What the buyer calls it
Baldwins Pond Dam Safety Improvements
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
27 Nov 2020
Work ends
31 Jul 2021

Who the buyer named

Michael Harrington was the named contact on this notice.

Michael.Harrington@cityoflondon.gov.uk