The project comprises the design and construction of improvements to Baldwins Pond, potentially including for (but not necessarily limited to):- a) Measures to permanently stem leakage through the dam, potentially by the formation of vertical "cut off" layer along the critical length of the dam, toed into natural sub-strata; b) Measures to provide a new impermeable lining to the remaining section of culvert/fill left after the fire damage to the previous 900mm diameter corrugated GRP pipe; c) Measures to provide an auxiliary emergency spillway to the dam, to convey flood flows that are beyond the capacity of the current arrangements, as appropriate to the catchment area and risk ca…
Details
- What the buyer calls it
- Baldwins Pond Dam Safety Improvements
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 27 Nov 2020
- Work ends
- 31 Jul 2021
Who the buyer named
Michael Harrington was the named contact on this notice.