Barnby Dun Play Area - Supply & Installation of Play Equipment & Surfacing
What the buyer wrote
To design, supply and install new play equipment and opportunities for junior and toddler (age range 3 - 14). The equipment should be modern, inventive and creative to encourage physical strength and challenge alongside imaginative play. The equipment can be either metal or timber construction or a combination. Design should consider future maintenance by the most cost effective means and suitability. The scheme does not require planning permission for items under 4m tall. All old equipment and surfacing to be removed and/or recycled. Public consultation indicated the following to be considered in the design: swings (junior/toddler/team/inclusive),trim trail and adventure mound,…
Details
- What the buyer calls it
- Barnby Dun Play Area - Supply & Installation of Play Equipment & Surfacing
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 14 Apr 2018
- Work ends
- 15 Jun 2018
Who the buyer named
Jill Samuels was the named contact on this notice.
