Barr Lodge - Boiler Plant Refurbishment and Associated Works
What the buyer wrote
The London Borough of Hillingdon (LBH) intends to replace the boilers and control system at: Barr Lodge Court , Bond Close, West Drayton, UB7 8DT - is a Sheltered Accommodation scheme. There are shared facilities include; laundry, lounge and kitchen, a) The heating plant room is located on the Ground Floor at the front of the building. There is only external access to the plant room. The Heating and Hot Water Services must be maintained during the refurbishment works with exception of 2 days for changeover to back up system and change back to new system. These actions will take place between 9.00am - 5.00pm THE WORKS. The works shall include all of the works described w…
Details
- What the buyer calls it
- Barr Lodge - Boiler Plant Refurbishment and Associated Works
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 6 Sep 2020
- Work ends
- 5 Oct 2020
Who the buyer named
Wayne Toovey was the named contact on this notice.
