Skip to the main content
The Crier

Beech Street Electrical Rewire

Your saved contracts

What the buyer wrote

The works shall be carried out in the main school building at Beech Street Primary School. The building is a two storey building of brick construction. The works involve the replacement of the electrical mains distribution system, the general and emergency lighting systems, the small power system, external lighting systems, fire alarm system and class change system, as detailed within this specification and shown on tender drawings. The electrical installations within the adjoining After Hours Club are to be retained apart from the new fire alarm system. The works shall also include the redecoration of the immediate areas that are affected by the strip out works.

Details

What the buyer calls it
Beech Street Electrical Rewire
How they are buying
Advertised, open to anyoneAny supplier could bid without being invited first.
Type
works
Suitable for small firms
The buyer says yes. What that is worth
Work starts
23 Jul 2017
Work ends
24 Sep 2017

Who the buyer named

Christine Flisk was the named contact on this notice.

christine.flisk@salford.gov.uk