Beyond Design Life Regulatory Expectations for the Substantiation of SSC's Important to Safety - Phase 2
Health & Safety Executiveservices
What the buyer wrote
ONR is seeking to engage one the Technical Support Contractors (TSC) appointed on Lot 2 of its Technical Support Framework. The TSC is required to establish for SSC's important to safety a regulatory basis on which to determine the adequacy of beyond design life substantiation under by duty holders. The project will identify different classes and types of SSCs minimum expectations against which ONR should determine beyond design life considerations have been adequately undertaken when considering the limitations of codes and standards used for such components.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Beyond Design Life Regulatory Expectations for the Substantiation of SSC's Important to Safety - Phase 2
- How they are buying
- Called off an existing agreementThe work went to a supplier already on a framework or dynamic market.
- Type
- services
- Work starts
- 30 Sep 2019
- Work ends
- 31 May 2020
- Kind of work
- Research, evaluation and insight
Who the buyer named
Julie Gratton was the named contact on this notice.
