What the buyer wrote
To supply and install metal posts (6"x6" RSJ) piled into the stream bed along the agreed stretch of the BP lake outflow, on the east side, replacing the full length of timber on this side of the channel. Lengths of steel will vary, depending on height of wall/channel at point of piling, but at the end supporting most weight the steel will be 6ft in the ground. 100 x Oak sleepers (2.4m long, 200mm x 100mm) will be placed between all RSJs and laid level. Any soil needed to back-fill will be excavated in from unseeded car park bank, exact location to be agreed when quantity is known. All rubbish (old wood etc.) will be taken off site unless requested by Country Park team. Any spare Oak sle…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Black Park Lake Outflow Bank Repair
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 15 Jun 2020
- Work ends
- 17 Jul 2020
Who the buyer named
Viv Hichens was the named contact on this notice.