What the buyer wrote
Isolate and remove old boilers from site Install No.2 new floor standing boilers in the same location as the existing one Carry out any pipework modifications Install new shunt pumps Replace the VT pumps and 3 way valve Replace pressurization unit Replace expansion vessel ?- requires inspection to see if it's necessary Install new gas fired hot water boiler to replace the existing one Carry out any pipework modifications required Install new sections and or modify existing flue system for both boilers Refill, test and commission boilers once controls completed Include all electrical works Include all Gas testing Site survey needed
Details
- What the buyer calls it
- Block 5 Heating & HWS Boiler Replacement
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 9 Apr 2017
- Work ends
- 21 Apr 2017
Who the buyer named
Corinne Youren was the named contact on this notice.