Boundary Stabilisation Works - 5 Ash Close, Willand
What the buyer wrote
• Removal of existing fencing and pathway. • The installation of screw piles with suitable 150mm sq. head plate with suitable tie detail for connection into the concrete beams. • The supply and install of 300mm x 450mm deep reinforced concrete 32/40 concrete ground beam with 15 kg/m reinforcement. • Installation of reinforced concrete 30/40 slab including 2 layers of A393 mesh • Reinstatement of pathway and fencing. • Levelling front and rear gardens. • Adjacent bank under the ownership of MDDC to be re-planted to hide any longer term settlement relative to path/fence and bind topsoil together for longer term surface soil protection.
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- Boundary Stabilisation Works - 5 Ash Close, Willand
- How they are buying
- Advertised, open to anyoneAny supplier could bid without being invited first.
- Type
- works
- Work starts
- 2 Sep 2025
- Work ends
- 5 Nov 2025
- Where
- in the South West
- Kind of work
- Civil engineering and groundworks
Who the buyer named
Paul Taylor was the named contact on this notice.
