Bromley Central Depot, Demolition and Reconstruction of Retaining Wall
What the buyer wrote
The project has biased toward major civils engineering works and will include element of contractor design as it will involve full site setup including erection of security hoardings, demolition of existing stable block buildings including associated hard-standings, approximate demolition area 550.00M3. Construction and installation of structurally designed concrete retaining wall structure in accordance with structural engineer design, approximately 30.00M long and 6.00M high. Following construction of monolithic concrete retaining wall structure a structurally designed cavity wall structure with a reinforced concrete core will be built directly on top of the new retaining wall structure, …
Details
- What the buyer calls it
- Bromley Central Depot, Demolition and Reconstruction of Retaining Wall
- How they are buying
- Advertised, shortlist firstSuppliers applied to be considered, and the buyer picked who went on to bid.
- Type
- works
- Suitable for small firms
- The buyer says yes. What that is worth
- Work starts
- 7 Oct 2019
- Work ends
- 22 May 2020
Who the buyer named
Lorraine Baker was the named contact on this notice.
