What the buyer wrote
BT's Public Service Telephone Network (PTSN) is being switched off (this is a global network change). The old copper lines are no longer available to buy as they are no longer sustainable and the equipment (switches etc) which supports the older infrastrucure is no longer available for repairs or replacements. The switch off deadline for businesses is 31/12/2025. However, BT need to know which lines need to be migrated over to Pre Digital Phone Lines (PDPL) where current operating systems etc do not currently work with a fibre line, by the 31 March 2025 and want to start to move lines that can be migrated now. This contract will be to ensure continuity for RBG's connections to fibre and PDPL…
Bid for this and lost? There is a short window in which the decision can be questioned.
Awarded to
Details
- What the buyer calls it
- BT Digital Switchover from PSTN
- How they are buying
- Given to one supplier, no competitionNobody else was asked, and the buyer has to be able to justify that.
- Work starts
- 31 Mar 2025
- Work ends
- 31 Mar 2027
- Where
- in London
- Kind of work
- Heating, plumbing and mechanical
Who the buyer named
Andrew Clark was the named contact on this notice.
